Puna Geothermal Venture

Photo Tour

Our Team: Focused on safety and efficiency.

Entrance to the power plant.

Entrance to the power plant.

Power generating equipment.

Power generating equipment.

Electrical substation.

Electrical substation.

PGV drilling rig.

PGV drilling rig.

Production well KS-10.

Production well KS-10.

Plant technician inspecting production well KS-6.

Plant technician inspecting production well KS-6.

Injection well KS-13

Injection well KS-13

Separation system, where steam and hot water is separated.

Separation system, where steam and hot water is separated.

Plant technician Taylor Sumida collecting operating equipment data.

Plant technician Taylor Sumida collecting operating equipment data.

Technicians installing an air conditioning unit.

Technicians installing an air conditioning unit.

Sodium hydroxide storage and transfer system.

Sodium hydroxide storage and transfer system.

Plant technician inspecting piping in the power block area.

Plant technician inspecting piping in the power block area.

Contractors working on concrete foundation.

Contractors working on concrete foundation.

Maintenance technician operating crane in power block area.

Maintenance technician operating crane in power block area.

Contractors working on concrete foundations.

Contractors working on concrete foundations.

Contract welder fabricating replacement piping.

Contract welder fabricating replacement piping.

Central Station Control, where a plant technician monitors overall power plant operations.

Central Station Control, where a plant technician monitors overall power plant operations.

Plant technician reviewing operational data.

Plant technician reviewing operational data.